China -  Chinese law firm

Do applications for utility models and industrial designs need a substantial examination as well?

No. Only a preliminary examination is required. If there is no cause for rejection of the application for a patent for utility model or design, it will be granted the right of patent, receive a patent certificate, and be registered and announced.

RSS Feeds